Wells Fargo Building

Reseda, CA (Completed 2023)
Project Details

This Wells Fargo Branch presented a problem to the Bank as it had water intrusion issues to the Southern Wall. Although not a large project the problem was significant. Careful consideration had to be given to the traffic that was present due to the drive through tellers that we were not able to shut down, therefore we were not able to spray the material in fear of overspray. The material was carefully rolled on to make sure we had the proper mil thickness. The project was a success as the application of the Solargard Hy-Build stopped the water intrusion and the client was happy with the result.